AMOUNT
|
DESCRIPTION
|
COST
|
TOTAL
|
.47
|
BRIDLE LEATHER STRAP (WIDTH WILL VARY FROM 3/4”-1 1/4” DEPENDING ON WIDTH OF CHEEK PIECES)
|
9.59
|
4.51
|
1
|
BUCKLE THAT MATCHES BUCKLES ON BRIDLE
|
0.51
|
0.51
|
|
MISC SUPPLIES @ 20% (THREAD-RIVETS-DYE-OIL, ETC.)
|
|
0.90
|
|
MATERIALS COST
|
|
5.92
|
|
PROFIT OR RETURN ON INVESTMENT ON MATERIALS USED
|
|
0.31
|
|
MATERIALS TOTAL COST
|
|
6.23
|
1.32
|
HOURS OF LABOR NEEDED FOR REPAIR
{ The shop rate is the total of your hourly wage and an hourly rate to cover your overhead costs }
|
SHOP RATE TOTAL
|
MATERIALS
&
SHOP RATE
TOTAL
|
|
HOURS OF LABOR NEEDED FOR REPAIR TIMES A SHOP RATE OF $ 40.00 PER HOUR
|
52.80
|
59.03
|
|
HOURS OF LABOR NEEDED FOR REPAIR TIMES A SHOP RATE OF $ 45.00 PER HOUR
|
59.40
|
65.63
|
|
HOURS OF LABOR AT A SHOP RATE OF $ 50.00 per HOUR
NATIONAL AVERAGE HOUSEHOLD INCOME
|
66.00
|
72.23
|
|
HOURS OF LABOR NEEDED FOR REPAIR TIMES A SHOP RATE OF $ 55.00 PER HOUR
|
72.60
|
78.83
|
|
HOURS OF LABOR NEEDED FOR REPAIR TIMES A SHOP RATE OF $ 60.00 PER HOUR
|
79.20
|
85.43
|