AMOUNT
|
DESCRIPTION
|
COST
|
TOTAL
|
1.86
|
BRIDLE LEATHER OF YOUR CHOICE
|
10.60
|
19.72
|
2
|
5/8" BUCKLE, LOOP, AND TIP OF YOUR CHOICE (IF BLT IS SILVER CHARGE ACCORDINGLY)
|
0.79
|
1.58
|
|
MISC SUPPLIES @ 20% (THREAD-RIVETS-DYE-OIL, ETC.)
|
|
3.94
|
|
MATERIALS COST
|
|
25.24
|
|
PROFIT OR RETURN ON INVESTMENT ON MATERIALS USED
|
|
1.33
|
|
MATERIALS TOTAL COST
|
|
26.57
|
1.17
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM
{ The shop rate is the total of your hourly wage and an hourly rate to cover your overhead costs }
|
SHOP RATE TOTAL
|
MATERIALS
&
SHOP RATE
TOTAL
|
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF $ 40.00 PER HOUR
|
46.80
|
73.37
|
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF $ 45.00 PER HOUR
|
52.65
|
79.22
|
|
HOURS OF LABOR AT A SHOP RATE OF $ 50.00 per HOUR
NATIONAL AVERAGE HOUSEHOLD INCOME
|
58.50
|
85.07
|
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF $ 55.00 PER HOUR
|
58.50
|
85.07
|
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF $ 60.00 PER HOUR
|
64.35
|
90.92
|