GO TO THE FOLLOWING




SINGLE PLY
REAR FLANK BILLETS
TABLE OF CONTENTS
 PAGE NAVIGATION  SCROLL DOWN OR CLICK ON YOUR AREA OF INTEREST

 1 1/2" SINGLE PLY REAR FLANK BILLETS WITH TIES


MATERIALS LIST AND COSTS  – Based on average costs and times for a saddle maker with 3/5 years of experience
AMOUNT
DESCRIPTION
COST
TOTAL
.78
SKIRTING LEATHER
11.25
8.78
2
3/8" X 12" TIE STRAPS
0.44
0.88
MISC SUPPLIES  @ 20% (THREAD-RIVETS-DYE-OIL, ETC.)
1.76
     MATERIALS COST
11.41
PROFIT OR RETURN ON INVESTMENT ON MATERIALS USED
0.60
MATERIALS TOTAL COST
12.01

.43

HOURS OF LABOR NEEDED TO MANUFACTURE ITEM

 { The shop rate is the total of your hourly wage and an hourly rate to cover your overhead costs }

SHOP RATE TOTAL
MATERIALS
&
 SHOP RATE
TOTAL
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF   $ 40.00 PER HOUR
17.20
29.21
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 45.00  PER HOUR
19.35
31.36
     HOURS OF LABOR AT A SHOP RATE OF $ 50.00 per HOUR
    NATIONAL AVERAGE HOUSEHOLD INCOME


21.50

33.51
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 55.00  PER HOUR
23.65
35.66
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF  $ 60.00  PER HOUR
25.80
37.81

TIMES  – Based on average times for a saddle maker with 3/5 years of experience
PROCESS
TIMES    (minutes)
CUT OUT BILLET STRAPS
6.25
FINISH  ENDS
1.75
EDGE, OIL, TOP COAT, AND DYE EDGES
12.50
MARK AND PUNCH HOLES
5.50
     TOTAL MINUTES
26.00
     TOTAL HOURS OF LABOR NEEDED TO MANUFACTURE ITEM
0.43

MATERIALS LIST
NO
DESCRIPTION
WIDTH
LENGTH
TOTAL
2
BILLET STRAPS - 1 ½" X 30                              
1.5
30.
90.00
     TOTAL SQ INCHES
90.00
          25% WASTE SQ INCHES
22.50
               TOTAL SQ FT
0.78

 1 3/4" SINGLE PLY REAR FLANK BILLETS WITH TIES


MATERIALS LIST AND COSTS  – Based on average costs and times for a saddle maker with 3/5 years of experience
AMOUNT
DESCRIPTION
COST
TOTAL
.91
SKIRTING LEATHER
11.25
10.24
2
3/8" X 12" TIE STRAPS
0.44
0.88
MISC SUPPLIES  @ 20% (THREAD-RIVETS-DYE-OIL, ETC.)
2.05
     MATERIALS COST
13.17
PROFIT OR RETURN ON INVESTMENT ON MATERIALS USED
0.69
MATERIALS TOTAL COST
13.86

.43

HOURS OF LABOR NEEDED TO MANUFACTURE ITEM

 { The shop rate is the total of your hourly wage and an hourly rate to cover your overhead costs }

SHOP RATE TOTAL
MATERIALS
&
 SHOP RATE
TOTAL
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF   $ 40.00 PER HOUR
17.20
31.06
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 45.00  PER HOUR
19.35
33.21
     HOURS OF LABOR AT A SHOP RATE OF $ 50.00 per HOUR
    NATIONAL AVERAGE HOUSEHOLD INCOME


21.50

35.36
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 55.00  PER HOUR
23.65
37.51
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF  $ 60.00  PER HOUR
25.80
39.66

TIMES  – Based on average times for a saddle maker with 3/5 years of experience
PROCESS
TIMES    (minutes)
CUT OUT BILLET STRAPS
6.25
FINISH  ENDS
1.75
EDGE, OIL, TOP COAT, AND DYE EDGES
12.50
MARK AND PUNCH HOLES
5.50
     TOTAL MINUTES
26.00
     TOTAL HOURS OF LABOR NEEDED TO MANUFACTURE ITEM
0.43

MATERIALS LIST
NO
DESCRIPTION
WIDTH
LENGTH
TOTAL
2
BILLET STRAPS - 1 3/4" X 30                              
1.75
30.
105.00
     TOTAL SQ INCHES
105.00
          25% WASTE SQ INCHES
26.25
               TOTAL SQ FT
0.91


 2" SINGLE PLY REAR FLANK BILLETS WITH TIES



MATERIALS LIST AND COSTS  – Based on average costs and times for a saddle maker with 3/5 years of experience
AMOUNT
DESCRIPTION
COST
TOTAL
1.04
SKIRTING LEATHER
11.25
11.70
2
3/8" X 12" TIE STRAPS
0.44
0.88
MISC SUPPLIES  @ 20% (THREAD-RIVETS-DYE-OIL, ETC.)
2.34
     MATERIALS COST
14.92
PROFIT OR RETURN ON INVESTMENT ON MATERIALS USED
0.79
MATERIALS TOTAL COST
15.71

.43

HOURS OF LABOR NEEDED TO MANUFACTURE ITEM

 { The shop rate is the total of your hourly wage and an hourly rate to cover your overhead costs }

SHOP RATE TOTAL
MATERIALS
&
 SHOP RATE
TOTAL
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF   $ 40.00 PER HOUR
17.20
32.91
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 45.00  PER HOUR
19.35
35.06
     HOURS OF LABOR AT A SHOP RATE OF $ 50.00 per HOUR
    NATIONAL AVERAGE HOUSEHOLD INCOME


21.50

37.21
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 55.00  PER HOUR
23.65
39.36
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF  $ 60.00  PER HOUR
25.80
41.51

TIMES  – Based on average times for a saddle maker with 3/5 years of experience
PROCESS
TIMES    (minutes)
CUT OUT BILLET STRAPS
6.25
FINISH  ENDS
1.75
EDGE, OIL, TOP COAT, AND DYE EDGES
12.50
MARK AND PUNCH HOLES
5.50
     TOTAL MINUTES
26.00
     TOTAL HOURS OF LABOR NEEDED TO MANUFACTURE ITEM
0.43

MATERIALS LIST
NO
DESCRIPTION
WIDTH
LENGTH
TOTAL
2
BILLET STRAPS - 1 ½" X 30                              
2.
30.
120.00
     TOTAL SQ INCHES
120.00
          25% WASTE SQ INCHES
30.00
               TOTAL SQ FT
1.04

 1 1/2" SINGLE PLY REAR FLANK BILLETS WITH BILLET LOOP



MATERIALS LIST AND COSTS  – Based on average costs and times for a saddle maker with 3/5 years of experience
AMOUNT
DESCRIPTION
COST
TOTAL
.85
SKIRTING LEATHER
11.25
9.56
MISC SUPPLIES  @ 20% (THREAD-RIVETS-DYE-OIL, ETC.)
1.91
     MATERIALS COST
11.48
PROFIT OR RETURN ON INVESTMENT ON MATERIALS USED
0.60
MATERIALS TOTAL COST
12.08

.49

HOURS OF LABOR NEEDED TO MANUFACTURE ITEM

 { The shop rate is the total of your hourly wage and an hourly rate to cover your overhead costs }

SHOP RATE TOTAL
MATERIALS
&
 SHOP RATE
TOTAL
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF   $ 40.00 PER HOUR
19.60
31.68
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 45.00  PER HOUR
22.05
34.13
     HOURS OF LABOR AT A SHOP RATE OF $ 50.00 per HOUR
    NATIONAL AVERAGE HOUSEHOLD INCOME


24.50

36.58
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 55.00  PER HOUR
26.95
39.03
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF  $ 60.00  PER HOUR
29.40
41.48
TIMES  – Based on average times for a saddle maker with 3/5 years of experience
PROCESS
TIMES    (minutes)
CUT OUT BILLET STRAPS
6.25
FINISH  ENDS
1.75
EDGE, OIL, TOP COAT, AND DYE EDGES
12.50
MAKE-UP AND STITCH ON BILLET LOOP
5.75
MARK AND PUNCH HOLES     
3.00
     TOTAL MINUTES
29.25
     TOTAL HOURS OF LABOR NEEDED TO MANUFACTURE ITEM
0.49

MATERIALS LIST
NO
DESCRIPTION
WIDTH
LENGTH
TOTAL
2
BILLET STRAPS - 1 ½" X 30                              
1.5
30.
90.00
2
BILLET LOOPS  - 1" X 4"
1
4
8.00
     TOTAL SQ INCHES
98.00
          25% WASTE SQ INCHES
24.50
               TOTAL SQ FT
0.85
 1 3/4" SINGLE PLY REAR FLANK BILLETS WITH BILLET LOOP

MATERIALS LIST AND COSTS  – Based on average costs and times for a saddle maker with 3/5 years of experience
AMOUNT
DESCRIPTION
COST
TOTAL
1.01
SKIRTING LEATHER
11.25
11.36
MISC SUPPLIES  @ 20% (THREAD-RIVETS-DYE-OIL, ETC.)
2.27
     MATERIALS COST
13.64
PROFIT OR RETURN ON INVESTMENT ON MATERIALS USED
0.72
MATERIALS TOTAL COST
14.35

.49

HOURS OF LABOR NEEDED TO MANUFACTURE ITEM

 { The shop rate is the total of your hourly wage and an hourly rate to cover your overhead costs }

SHOP RATE TOTAL
MATERIALS
&
 SHOP RATE
TOTAL
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF   $ 40.00 PER HOUR
19.60
33.95
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 45.00  PER HOUR
22.05
36.40
     HOURS OF LABOR AT A SHOP RATE OF $ 50.00 per HOUR
    NATIONAL AVERAGE HOUSEHOLD INCOME


24.50

38.85
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 55.00  PER HOUR
26.95
41.30
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF  $ 60.00  PER HOUR
29.40
43.75
TIMES Based on average times for a saddle maker with 3/5 years of experience
PROCESS
TIMES    (minutes)
CUT OUT BILLET STRAPS
6.25
FINISH  ENDS
1.75
EDGE, OIL, TOP COAT, AND DYE EDGES
12.50
MAKE-UP AND STITCH ON BILLET LOOP
5.75
MARK AND PUNCH HOLES     
3.00
     TOTAL MINUTES
29.25
     TOTAL HOURS OF LABOR NEEDED TO MANUFACTURE ITEM
0.49

MATERIALS LIST
NO
DESCRIPTION
WIDTH
LENGTH
TOTAL
2
BILLET STRAPS - 1 3/4" X 30                              
1.75
30.
105.00
2
BILLET LOOPS  - 1 1/4" X 4 1/2"
1.25
4.5
11.25
     TOTAL SQ INCHES
116.25
          25% WASTE SQ INCHES
29.06
               TOTAL SQ FT
1.01

 2" SINGLE PLY REAR FLANK BILLETS WITH BILLET LOOP


MATERIALS LIST AND COSTS  – Based on average costs and times for a saddle maker with 3/5 years of experience
AMOUNT
DESCRIPTION
COST
TOTAL
1.17
SKIRTING LEATHER
11.25
13.16
MISC SUPPLIES  @ 20% (THREAD-RIVETS-DYE-OIL, ETC.)
2.63
     MATERIALS COST
15.80
PROFIT OR RETURN ON INVESTMENT ON MATERIALS USED
0.83
MATERIALS TOTAL COST
16.63

.49

HOURS OF LABOR NEEDED TO MANUFACTURE ITEM

 { The shop rate is the total of your hourly wage and an hourly rate to cover your overhead costs }

SHOP RATE TOTAL
MATERIALS
&
 SHOP RATE
TOTAL
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF   $ 40.00 PER HOUR
19.60
36.23
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 45.00  PER HOUR
22.05
38.68
     HOURS OF LABOR AT A SHOP RATE OF $ 50.00 per HOUR
    NATIONAL AVERAGE HOUSEHOLD INCOME


24.50

41.13
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT  A SHOP RATE OF  $ 55.00  PER HOUR
26.95
43.58
    HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF  $ 60.00  PER HOUR
29.40
46.03
TIMES Based on average times for a saddle maker with 3/5 years of experience
PROCESS
TIMES    (minutes)
CUT OUT BILLET STRAPS
6.25
FINISH  ENDS
1.75
EDGE, OIL, TOP COAT, AND DYE EDGES
12.50
MAKE-UP AND STITCH ON BILLET LOOP
5.75
MARK AND PUNCH HOLES     
3.00
     TOTAL MINUTES
29.25
     TOTAL HOURS OF LABOR NEEDED TO MANUFACTURE ITEM
0.49

MATERIALS LIST
NO
DESCRIPTION
WIDTH
LENGTH
TOTAL
2
BILLET STRAPS - 2" X 30                              
2.
30.
120.00
2
BILLET LOOPS  - 1 1/2" X 5"
1.5
5
15.00
     TOTAL SQ INCHES
135.00
          25% WASTE SQ INCHES
33.75
               TOTAL SQ FT
1.17



Copyright 2005 - 2016 American Saddle Makers Association, Inc.