AMOUNT
|
DESCRIPTION
|
COST
|
TOTAL
|
1.09
|
9/10+ OZ SQ FT LATIGO LEATHER
|
7.97
|
8.69
|
1
|
3/8" X 12" LATIGO TIE
|
0.36
|
0.36
|
|
MISC SUPPLIES @ 20% (THREAD-RIVETS-DYE-OIL, ETC.)
|
|
1.74
|
|
MATERIALS COST
|
|
10.78
|
|
PROFIT OR RETURN ON INVESTMENT ON MATERIALS USED
|
|
0.57
|
|
MATERIALS TOTAL COST
|
|
11.35
|
.34
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM
{ The shop rate is the total of your hourly wage and an hourly rate to cover your overhead costs }
|
SHOP RATE TOTAL
|
MATERIALS
&
SHOP RATE
TOTAL
|
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF $ 40.00 PER HOUR
|
13.60
|
24.95
|
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF $ 45.00 PER HOUR
|
15.30
|
26.65
|
|
HOURS OF LABOR AT A SHOP RATE OF $47.00 PER HOUR
NATIONAL AVERAGE HOUSEHOLD INCOME
|
15.98
|
27.33
|
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF $ 50.00 PER HOUR
|
17.00
|
28.35
|
|
HOURS OF LABOR NEEDED TO MANUFACTURE ITEM AT A SHOP RATE OF $ 55.00 PER HOUR
|
18.70
|
30.05
|